Harbor East Renovated Lobby Floor
This project was difficult because the floor was cracking from the time the building was new. We had to tear out the old tile floor, incorrectly poured concrete, re-level the floor, rubberize the new concrete to make sure the new tile flooring ever cracked again, and install the new tile. This took about 2 weeks.
I am happy to say after 14 years the floor still looks the same as the day we finished. No cracks anywhere. I am very proud of this project and what our crews can do.